List of Completed BIPs
AS OF DECEMBER 31, 2007
  USAID
Conc No.
CIP No. Project Title Location Province Type Project Cost No. of Bene-
ficiaries
Remarks
1) 9 C-001 Bualan Grains Warehouse and Solar Dryer Construction Brgy. Bualan, Balindong, Lanao del Sur Lanao del Sur GWSD        783,992              100 completed
2) 19 C-002 Upper Kadigasan Grains Warehouse and Solar Dryer Construction Brgy. Kadigasan, Midsayap, North Cotabato North Cotabato GWSD        615,728              100 completed
3) 20 C-003  Upper Rebi Grains Warehouse and Solar Dryer Construction Sitio Upper Rebi, Brgy. Pigcawaran, Alamada, North Cotabato North Cotabato GWSD        685,799              104 completed
4) 22 C-004 Taneb Grains Warehouse and Solar Dryer Construction Sitio Taneb, Brgy. Mindupok, Maitum, Sarangani Sarangani GWSD        749,901                68 completed
5) 24 C-005 Lutayan Proper Grains Warehouse and Solar Dryer Construction Brgy. Lutayan Proper, Lutayan, Sultan Kudarat Sultan Kudarat GWSD        668,606                25 completed
6) 11 C-006 Cablangan Grains Warehouse and Solar Dryer Construction Brgy. Cablangan, Poona Piagapo, Lanao del Norte Lanao del Norte GWSD        799,991              300 completed
7) 29 C-007 Tungbato Seaweed Warehouse and Solar Dryer Construction Sitio Tungbato, Brgy. Muti, Zamboanga City, Zamboanga City Zamboanga City SWSD        737,199              138 completed
8) 38 C-008 Gandamato Grains Warehouse and Solar Dryer Construction Brgy. Gandamato, Marogong, Lanao del Sur Lanao del Sur GWSD     1,314,485              250 completed
9) 21 C-009  Kitulaan Grains Warehouse and Solar Dryer Construction Brgy. Kitulaan, Carmen, North Cotabato North Cotabato GWSD        674,717                70 completed
10) 13 C-010 Manilong Grains Warehouse and Solar Dryer Construction Sitio Manilong, Brgy. Banaba, Ampatuan, Maguindanao Maguindanao GWSD        643,976                30 completed
11) 14 C-011 Binibiran Grains Warehouse and Solar Dryer Construction Sitio Binibiran, Brgy. Salman, Ampatuan, Maguindanao Maguindanao GWSD        675,988                75 completed
12) 16 C-012 Urandang  Grains Warehouse and Solar Dryer Construction Brgy. Urandang, Parang, Shariff Kabunsuan Shariff Kabunsuan GWSD        669,571                25 completed
13) 18 C-013 Kiludan Grains Warehouse and Solar Dryer Construction Sitio Kiludan, Brgy. Damalusay, Paglat, Maguindanao Maguindanao GWSD        780,372                50 completed
14) 23 C-014 Purok 7 Grains Warehouse and Solar Dryer Construction Purok 7, Brgy. Sumbakil, Polomolok, South Cotabato South Cotabato GWSD        615,664                64 completed
15) 25 C-015 Mamali Grains Warehouse and Solar Dryer Construction Brgy. Mamali, Lutayan, Sultan Kudarat Sultan Kudarat GWSD        754,420              100 completed
16) 26 C-016 Kilabon Grains Warehouse and Solar Dryer Construction Sitio Kilabon, Brgy. Kanipaan, Palimbang, Sultan Kudarat Sultan Kudarat GWSD        835,502                30 completed
17) 39 C-017 Rorugagos Grains Warehouse and Solar Dryer Construction Brgy. Rorugagos, Marawi City, Marawi City Marawi City GWSD        840,000              450 completed
18) 27 C-018 Tulay Seaweed Warehouse and Solar Dryer Construction Brgy. Tulay, Jolo, Sulu Sulu SWSD        977,229              437 completed
19) 37 C-020 Niog-Niog Seaweed Warehouse and Solar Dryer Construction Sitio Niog-Niog, Brgy. Muti, Zamboanga City, Zamboanga City Zamboanga City SWSD        922,047                38 completed
20) 17 C-021 Central Langkong Grains Warehouse and Solar Dryer Construction Brgy. Central Langkong, Matanog, Shariff Kabunsuan Shariff Kabunsuan GWSD        780,215                43 completed
21) 8 C-022 Camp Jakarta Grains Warehouse and Solar Dryer Construction Camp Jakarta, Brgy. Matanog Bomba, Balabagan, Lanao del Sur Lanao del Sur GWSD     1,059,874              100 completed
22) 7 C-023 Magampong Grains Warehouse and Solar Dryer Construction Sitio Magampong, Brgy. Park Area, Wao, Lanao del Sur Lanao del Sur GWSD     1,051,413                75 completed
23) 6 C-024 Pilintangan Grains Warehouse and Solar Dryer  Construction Brgy. Pilintangan, Wao, Lanao del Sur Lanao del Sur GWSD     1,035,889                60 completed
24) 1 C-025 Pindulunan Grains Warehouse and Solar Dryer Construction Brgy. Pindolunan, Munai, Lanao del Norte Lanao del Norte GWSD     1,195,006              200 completed
25) 3 C-026 Kalian-Daladagan Road Rehabilitation Brgy. Kalian/Daladagan, Buluan, Maguindanao Maguindanao ROAD     1,898,417           3,462 completed
26) 51 C-027 Calimodan Grains Warehouse and Solar Dryer Construction Brgy. Calimodan, Salvador, Lanao del Norte Lanao del Norte GWSD     1,061,063              500 completed
27) 48 C-028 Pagagawan Proper Grains Warehouse and Solar Dryer Construction Brgy. Pagagawan Proper, Pagagawan, Maguindanao Maguindanao GWSD        786,803                40 completed
28) 50 C-029 Proper Langkong Grains Warehouse and Solar Dryer Construction Brgy. Proper Langkong, Matanog, Shariff Kabunsuan Shariff Kabunsuan GWSD        754,587                25 completed
29) 42 C-030 Sulu Provincial Hospital Covered Walkway Construction Brgy. Asturias, Jolo, Sulu Sulu OTHERS        622,595              546 completed
30) 49 C-031 New Egaņa Grains Warehouse and Solar Dryer Construction Sitio New Egaņa, Brgy. D. Lotilla, Isulan, Sultan Kudarat Sultan Kudarat GWSD        677,054                60 completed
31) 70 C-032 Tibao Grains Warehouse Construction (formerly w/ Solar Dryer) Brgy. Tibao, M'lang, North Cotabato North Cotabato GWSD        605,438                54 completed
32) 71 C-033 Sitio Overland Grains Warehouse and Solar Dryer Construction Sitio Overland, Brgy. Diplo, Kumalarang, Zamboanga del Sur Zamboanga del Sur GWSD        720,994                54 completed
33) 89 C-034 Sicade Grains Warehouse and Solar Dryer Construction Brgy. Sicade, Kumalarang, Zamboanga del Sur Zamboanga del Sur GWSD        741,997                70 completed
34) 34 C-035 Himbah Wooden Port Construction Brgy. Himbah, Tandubas, Tawi-Tawi Tawi-Tawi BL        904,031           4,800 completed
35) 58 C-036 Lupah Pula Boat Landing  Construction Brgy. Lupah Pula, Bongao, Tawi-Tawi Tawi-Tawi BL        903,987           1,163 completed
36) 65 C-037 Tabtabon Boat Landing Construction Brgy. Tabtabon, Zamboanga City, Zamboanga City Zamboanga City BL     1,216,040           3,276 completed
37) 77 C-038 Ungus-Ungus Boat Landing Construction Brgy. Ungus-Ungus, Bongao, Tawi-Tawi Tawi-Tawi BL     1,095,206              649 completed
38) 35 C-039 Olango Box Culvert Construction Brgy. Olango, Magsaysay, Lanao del Norte Lanao del Norte Box Culvert        845,997         11,218 completed
39) 69 C-040 Cawayan Kalaw Grains Warehouse & Solar Dryer Construcition Brgy. Cawayan Kalaw, Marantao, Lanao del Sur Lanao del Sur GWSD        728,303                49 completed
40) 91 C-041 Bintana Grains Warehouse and Solar Dryer Construction Sitio Bintana, Brgy. Daguma, Bagumbayan, Sultan Kudarat Sultan Kudarat GWSD        581,768                35 completed
41) 90 C-042 Pulatana Grains Warehouse and Solar Dryer Construction Sitio Pulatana, Brgy. Malandag, Malungon, Sarangani Sarangani GWSD        707,270                50 completed
42) 113 C-043 Lagandang Grains Warehouse and Solar Dryer Construction Brgy. Lagandang, Isulan, Sultan Kudarat Sultan Kudarat GWSD        697,929                52 completed
43) 92 C-044 Bual Grains Warehouse and Solar Dryer Construction Brgy. Bual, Isulan, Sultan Kudarat Sultan Kudarat GWSD        667,898                25 completed
44) 68 C-045 Gen. Luna Solar Dryer Construction (formerly w/ Warehouse) Brgy. Gen. Luna, Carmen, North Cotabato North Cotabato GSD        332,262                89 completed
45) 15 C-046 Dado Grains Solar Dryer Construction (formerly w/ Warehouse) Brgy. Dado, Datu Piang, Maguindanao Maguindanao GSD        552,861              243 completed
46) 41 C-047 Malangit Community Center Construction Brgy. Malangit, Buluan, Maguindanao Maguindanao CC        580,420           2,028 completed
47) 93 C-048 Sapu Masla Community Center Construction Brgy. Sapu Masla, , Malapatan, Sarangani Sarangani CC        782,183           5,472 completed
48) 2 C-049 Lunen Spring Development Level  Construction Brgy. Lunen, Tupi, South Cotabato South Cotabato WS        985,573                35 completed
49) 88 C-050 Kuden Grains Warehouse and Solar Dryer Construction Brgy. Kuden, Talitay, Maguindanao Maguindanao GWSD        758,481                49 completed
50) 40 C-051 Poblacion Pagagawan Trading Center Construction (Community Center)  Bgry. Poblacion (Tunggol), Pagagawan, Maguindanao Maguindanao TC        942,023           3,803 completed
51) 115 C-052 Pendulunan Kapai Grains Solar Dryer Construction (2 units) Brgy. Pendulunan, Kapai, Lanao del Sur Lanao del Sur GSD        316,035                67 completed
52) 94 C-053 Glan Community Center Construction Glan, Sarangai Province, Glan, Sarangani Sarangani CC        855,886           8,041 completed
53) 52 C-054 Layog Community Center Construction Brgy. Layog, Pagalungan, Maguindanao Maguindanao CC        534,078           2,231 completed
54) 61 C-055 Dagupan Community Center Construction Brgy. Dagupan, Kabacan, North Cotabato North Cotabato CC        892,713           1,966 completed
55) 114 C-056 Diplo Grains Solar Dryer Construction (2 units) Brgy. Diplo, Kumalarang, Zamboanga del Sur Zamboanga del Sur GSD        548,594                50 completed
56) 81 C-057 Pag-asa Community Center Construction Brgy. Pag-asa, Bongao, Tawi-Tawi Tawi-Tawi CC        683,796           4,398 completed
57) 105 C-058 Wanni Piyanjihan Community Center Construction Brgy. Wanni Piyanjihan, ParangSulu, Sulu Sulu CC        890,508           1,294 completed
58) 106 C-059 Piyahan Community Center Construction Brgy. Piyahan, ParangSulu, Sulu Sulu CC        703,298           1,211 completed
59) 116 C-060 San Pedro Seaweed Solar Dryer construction (2 units) Brgy. San Pedro, Pagadian City, Pagadian City Pagadian City SSD        382,963                80 completed
60) 117 C-061 Poloyagan Seaweed Solar Dryer construction (2 units) Brgy. Pulayagan, Pagadian City, Pagadian City Pagadian City SSD        512,098              107 completed
61) 118 C-062 Bomba Seaweed Solar Dryer construction (2 units) Brgy. Bomba, Pagadian City, Pagadian City Pagadian City SSD        662,122                60 completed
62) 119 C-063 Napolan Seaweed Solar Dryer construction (2 units) Brgy. Napolan, Pagadian City, Pagadian City Pagadian City SSD        217,459                29 completed
63) 120 C-064 Tawagan Sur Seaweed Solar Dryer construction (2 units) Brgy. Tawagan Sur, Pagadian City, Pagadian City Pagadian City SSD        483,704                66 completed
64) 121 C-065 Muricay Seaweed Solar Dryer construction (2 units) Brgy. Muricay, Pagadian City, Pagadian City Pagadian City SSD        512,098                60 completed
65) 107 C-066 Lower Sampunay Community Center Construction Brgy. Lower Sampunay, ParangSulu, Sulu Sulu CC        678,428           1,043 completed
66) 79 C-067 Tangngah Community Center Construction Brgy. Tangngah, Tandubas, Tawi-Tawi Tawi-Tawi CC        782,939           1,608 completed
67) 76 C-068 Sallangan Boat Landing Construction Brgy. Sallangan, Tandubas, Tawi-Tawi Tawi-Tawi BL     1,159,367           1,408 completed
68) 84 C-069 Sitimpah Boat Landing Construction Brgy. Luuk, Pandan, Bongao, Tawi-Tawi Tawi-Tawi BL        940,157           2,014 completed
69) 55 C-070 New Baguio Spring Development Construction Brgy. New Baguio, Makilala, North Cotabato North Cotabato WS     1,420,634           1,128 completed
70) 123 C-071 Timbangan Community Center Construction Brgy. Timbangan, Indanan, Sulu Sulu CC     1,062,336           1,922 completed
71) 124 C-072 Silangkan Community Center Construction Brgy. Silangkan, ParangSulu, Sulu Sulu CC        629,685           1,883 completed
72) 125 C-073 Liang Community Center Construction Brgy. Liang , Patikul, Sulu Sulu CC        689,504              685 completed
73) 12 C-074 Guinibon Grains Warehouse and Solar Dryer Construction Brgy. Guinibon, Ampatuan, Maguindanao Maguindanao GWSD        882,814              139 completed
74) 135 C-075 Papandeyan Caniongan Community Center Construction Brgy. Papandeyan Caniongan, Marawi City, Marawi City Marawi City CC     1,126,271              576 completed
75) 136 C-076 Boganga Community Center Construction Brgy. Boganga, Marawi City, Marawi City Marawi City CC     1,111,809              910 completed
76) 139 C-077 Pelingkingan Grains Warehouse and Solar Dryer Construction Brgy. Pelingkingan, Tangkal, Lanao del Norte Lanao del Norte GWSD        877,239                27 completed
77) 130 C-078 Tamontaka Mother Community Center Construction Brgy.Tamontaka Mother, Cotabato City, Cotabato City Cotabato City CC        812,949           6,725 completed
78) 112 C-079 Maigo Drainage System construction/rehabilitation Poblacion, Maigo, Lanao del Norte Lanao del Norte DRAINAGE     1,224,227           2,803 completed
79) 109 C-080 Pualas Water Supply System (Spring Development) Brgy. Pualas, Tubod, Lanao del Norte Lanao del Norte WS        631,925           2,496 completed
80) 62 C-081 Owas Water System Construction (Spring Development)  Brgy. Owas, Magpet, North Cotabato North Cotabato WS     1,100,244              753 completed
81) 140 C-082 Tambad Grains Warehouse Construction Brgy. Tambad, Carmen, North Cotabato North Cotabato GWSD        586,977                50 completed
82) 131 C-083 Damaniog Community Center Construction Brgy. Damaniog, Sultan Kudarat, Shariff Kabunsuan Shariff Kabunsuan CC        571,522           1,531 completed
83) 138 C-084 Poblacion Tamparan Community Center Construction Brgy. Poblacion Tamparan, Tamparan, Lanao del Sur Lanao del Sur CC        636,416              744 completed
84) 129 C-085 Tanuel Community Center Construction Brgy. Tanuel, Datu Odin Sinsuat, Shariff Kabunsuan Shariff Kabunsuan CC        682,648           1,340 completed
85) 127 C-086 Tubig Tanah Community Center Construction Brgy. Tubig Tanah, Bongao, Tawi-Tawi Tawi-Tawi CC        722,760           4,121 completed
86) 128 C-087 Pag-asinan Community Center Construction Bgry. Pag-asinan, Simunul, Tawi-Tawi Tawi-Tawi CC        824,653              719 completed
87) 141 C-088 Subah Kandiis Seaweed Solar Dryer Consruction Brgy. Tigtabon, Zamboanga City, Zamboanga City Zamboanga City SSD        648,932              256 completed
88) 75 C-089 Tunggol Boat Landing Rehabilitation Brgy. Tunggol, Pagagawan, Maguindanao Maguindanao BL     1,194,208           3,427 completed
89) 54 C-090 Nangaan Water System Construction(Spring Development)  Brgy. Nangaan, Kabacan, North Cotabato North Cotabato WS     1,001,011              330 completed
90) 57 C-091 Tungbangkaw Boat Landing Construction Brgy. Tungbangkaw, Tandubas, Tawi-Tawi Tawi-Tawi BL        819,480           1,238 completed
91) 158 C-092 TTSRC Bangsamoro Women Seaweed Solar Dryer Construction Tongbangkaw, Bellatan Island, Panglima Sugala, Tawi-Tawi Tawi-Tawi SSD        342,884                32 completed
92) 159 C-093 Dayang Balukbuk Seaweed Solar Dryer Construction Tongbangkaw, Bellatan Island, Panglima Sugala, Tawi-Tawi Tawi-Tawi SSD        472,068                50 completed
93) 157 C-094 Sumping Malul Bangsamoro Seaweed Solar Dryer Construction Tongbangkaw, Bellatan Island, Panglima Sugala, Tawi-Tawi Tawi-Tawi SSD        341,902                31 completed
94) 160 C-095 TAGUSA Seaweed Solar Dryer Construction Tanguenguiron, Tubod, Lanao del Norte Lanao del Norte SSD        365,944              116 completed
95) 156 C-096 KOSGA Seaweed Warehouse & Solar Dryer Construction Manga, Kolambugan, Lanao del Norte Lanao del Norte SWSD        858,844              335 completed
96) 80 C-097 Pagasinan Boat Landing Construction Brgy. Pagasinan, Bongao, Tawi-Tawi Tawi-Tawi BL     1,002,905              903 completed
97) 104 C-098 Bato-Bato Boat Landing Rehabilitation Brgy. Bato-Bato, Indanan, Sulu Sulu BL        688,898           3,219 completed
98) 43 C-099 Matilac Road Rehabilitation Brgy. Matilac, Pigcawayan, North Cotabato North Cotabato ROAD        709,424           1,405 completed
99) 4 C-100 Batulawan-Barungis Road Rehabiltation Brgy. Batulawan/Barungis, Pikit, North Cotabato North Cotabato ROAD     2,200,017           3,160 completed
100) 150 C-101 Bangas Boat Landing Rehabilitation Brgy. Bangas, Hadji Panglima Tahil (Marunggas), Sulu Sulu BL        885,772           2,095 completed
101) 83 C-102 Buton Boat Landing Rehabilitation Brgy. Buton, Tuburan, Basilan Basilan BL     1,475,224           2,068 completed
102) 32 C-103 Alog Water System Construction Brgy. Alog, Lumbatan, Lanao del Sur Lanao del Sur WS     1,684,220           1,000 completed
103) 30 C-104 Sultan Pandapatan-Biabi Water System Rehabilitation Brgy. Sultan Pandapatan-Biabi, Bayang, Lanao del Sur Lanao del Sur WS     1,346,100              731 completed
104) 142 C-106 Kalanganan Mother Water System Development Brgy. Kalanganan Mother, Cotabato City, Cotabato City Cotabato City WS     1,039,766           6,377 completed
105) 63 C-107 Marambuaya 2.4 kms. Road Rehabilitation Brgy. Marambuaya, Wao, Lanao del Sur Lanao del Sur ROAD     2,117,409           1,200 completed
106) 149 C-108 Karungdung Boat Landing Rehabilitation Brgy. Karungdung, Bongao, Tawi-Tawi Tawi-Tawi BL        859,440           1,094 completed
107) 56